- November 21 - Bare land, before actual construction began.
- December 5 - Foundation goes in (correctly, this time)!
- December 12 - Materials have been delivered.
- December 29 - Walls! We're getting walls!
- January 2 - Roof trusses were started.
- January 10 - Interior framing has begun.
- January 17 - Roof trusses and interior framing are coming along!
- January 31 - Roof decking is nearly complete.
- February 8 - Roof decking completed and inside work continues
- February 20 - Roofing is near completion, vapor wrap has begun, rough plumbing is in, as is the gas fireplace, patio skylights and furnace! Big progress happened these last two weeks with the beautiful Bend weather.
- February 27 - The moisture barrier is done, the roof is done, and the windows are in! It's hard to believe we squeaked all this in before another late winter snow storm happened. Phew!
- View of the rear of our house taken from the hiking trail on Sunset Hill. This is the only place we have such a view!
- March 8 - There does not seem to be much going on outside, but most of the electrical and lighting is now done on the inside
- March 17 - Exterior siding has begun, and window trim is complete.
- March 20 - view from the back corner of our yard
- April 1 - Drywall is in progress. Let the mess begin!
- April 19 - Garage doors and gutters have been installed
- April 19 - The great room is looking a little better than the last time we saw it!
- April 19 - View to the kitchen from the great room
- April 19 - dining room cabinets are in, and flooring has been delivered for installation next week
- April 19 - Wet bar cabinets have been installed in the flex/TV room
- May 3 - exterior stone columns are in progress, as is the painting. Front door is on and interior casework is in progress.
- June 27 - Kitchen view, from great room
- June 27 - View from the entry hall.
- June 27 - great room
- June 27 - flex room
- June 27 - flex room bar
- June 27 - laundry room
- June 27 - master shower
- June 27 - Guest room bath
- June 27 - covered patio with our folding chairs so we had a place to sit!
Check this page often, or check the box below that says “NOTIFY ME OF NEW POSTS BY EMAIL...” I’ll continue to add photos to this slideshow of our new home’s construction progress, so if you’re interested you’ll be among the first to know.
Hint: If you just want to see the very latest photo, click the left hand arrow on the slide show as soon as it loads. Or, click the right-most “dot” under the slide show.
–pk
Looks like you can move in now since you’ve got the wet bar installed! 🙂
Wow, LOTS of progress! I love those garage doors with the avant-garde windows. The cabinetry looks very nice.
Congratulations! Looks Good.
I can imagine the waiting is hard! Very happy for you guys to finally see this part of your plans coming together. You and Dad have talked about retiring to Bend for what seems like my entire life!
Love you both!
Love you back, very much! And you know I’ll be holding your room ready for all your visits!
xoxo
Thanks for the photo updates. When is the estimated completion date?
Hopefully sometime in May.
Looking very good! Please keep those pics coming.
That’s the plan!